Today in prep for the counters going in, Mike came over and built us a bar wall.
Palm Tree Trimming
Washing Dishes In The Backyard
Cabinets Installed
Final Touches Before Cabinets
Mudding and Primer
Installing New Ceiling Drywall – Day 2
We started at 10am and finished at 9:30pm. What a long day! We managed to get most of the drywall up on the ceiling and around the upper wall. This was a very tough job. I am sure that Mike Holmes would not approve of our work, but I am pretty happy with the way it turned out (especially for a bunch of amateurs).
Installing New Ceiling Drywall – Day 1
Karl and Greg came over to help me get started with installing the new drywall on the kitchen ceiling. Doing drywall on the ceiling is MUCH more difficult and time consuming than I anticipated. It took us three hours to get two sheets up with the cutouts for the lights and vents. I know, I know, we are a bunch of amateurs!!